Home>Corporate>Environmental Preservation>History

Environmental Preservation-History

History

2010

October 5 Pioneer "GomiZero 1st Quarter (2010)" Activities

2009

November 11 Forestation/Tree-Planting Activities (PBL)
September 14 New Environmental Technology Permanent Exhibition in China
September 13 Pioneer acquires integrated ISO 14001 certification for all domestic group companies
September 11 Environment Monthly Photo Contest (Kawasaki Plant)
June 17 PFA Winner of Sainokuni Green Plan Award
June 14 Participation in "Festakankyo in Megro 2009"
February 4 Environmental Lessons on Demand by Tohoku Pioneer’s Yonezawa Plant
January 20 PTM got Prime Minister Industry Award 2008 (Thailand)
January 20 MPT got award at Malaysian National Quality Environment Convention

2008

June 14 Lecture on Environmental Activities at Tokyo Metropolitan University.
May 29 World Environment Conference 2008

2007

October 16 Pioneer Acquires Company-wide Integrated ISO14001 Certification

2006

February 2 Pioneer becomes a Partner Company of the Sustain Energy Europe 2005-2008 Campaign

2005

October 18 Open House 10th ANNIVERSARY was held at plant in Portugal
July 8 The tree plantation for commemoration with Wat Thong School students in Thailand
January 28 PTW(Taiwan) Engages in Corporate Citizen Activities through Garbage Clean-up and PC Contributions
January 28 Pioneer PDP-435SX 43-inch Digital HD Plasma TV Wins the 2004 ECCJ Chairman’s Award

2004

October 21 MND(CHINA) Holds First "No-Trash Campaign" in Industrial Zone
January 19 MPT (MALAYSIA) Receives Appreciation Award For Its Support in Recycling Activity

2003

November 12 PTK(UK) WINS LOCAL ENVIRONMENTAL AWARD
Top of the Page

Pioneer’s History of Environmental Preservation

2010 November Towada Pioneer won Excellent Award in Ecological-drive contest
  October
November
Cyber Navi won Green IT AWARD and Green Purchasing Award
  April "Pioneer GomiZero 1st Quarter" activities is put into effect.
2009 November Demand Bus System wins Green Purchasing Award
  September Integrated ISO14001 certification at Pioneer Group companies nationwide
2008 December Cyber Navi AVIC-VH9000 won Eco-Products Award
  August Established Advanced Eco-Model certification system
2007 August ISO 14001 certification of the environmental management systems in all Pioneer Group was integrated.
2006 February Awarded Economy, Trade and Industry Minister’s Award in the Green Purchasing Awards.
2005 February Plasma TV (PDP-435SX) awarded Energy Conservation Grand Prix.
  February ISO 14001 certification is completed at all bases worldwide.
2004 December Corn starch resin optical discs were introduced to the public in Eco-Products 2004.
  March The China regional headquarters obtained ISO14001 certification.
  January Completed achieving ISO14001 certification for all the European region corporations.
2003 November Established the Environmental Preservation Group and inaugurated the Eco Products Division.
  November Conducted an Opinion Exchange Forum for third parties about the Environmental Report.
  March The North America and Asian headquarters achieved ISO14001 certification.
2002 November Newly established Chinese production company begins ISO14001 acquisition.
  June Mini Rakura DVD player launched as the first product of the internal Eco Champion Support System.
  June First World Environment Conference held.
  March In-company Life Cycle Assessment (LCA) system is established.
  March Full-scale introduction of lead-free solder to products manufactured in Japan begins.
  March European headquarters obtains ISO 14001 certification.
2001 October Publication of site reports begins.
  April Environmental Accounting system is introduced, and its introduction to overseas plants commences.
  March ISO 14001 certification is completed at all of Pioneer’s main manufacturing facilities worldwide.
  March Pioneer Headquarters obtains ISO 14001 certification.
2000 December Pioneer participates in Eco Products Expo Japan.
  October Awards ceremony for the First Pioneer Environment Contribution Awards is held.
  July Green Procurement Standards are published.
  June Public announcements of environmental accounting begin.
1999 June First issue of the Pioneer Environmental Report is published.
  March ISO 14001 certification is completed at all Pioneer design and manufacturing facilities in Japan.
1998 November Products with lead-free solder go on sale.
  October Pioneer Environmental Label is established.
  August Division of Environmental Preservation is established with a full-time director in charge.
1996 June Tokorozawa Plant obtains ISO 14001 certification (the first in the Pioneer Group).
  March HCFCs (substitute for CFCs) are eliminated from all Pioneer Group manufacturing processes.
1995 June A Pioneer director is named to take charge of environmental affairs.
1993 February Use of collapsible cardboard packaging for A/V products is adopted; collection and recycling of nickel-cadmium batteries begins.
1992 November Environmental Preservation Policies are established as an Environmental Charter.
  September Product assessments are begun for all electrical appliances.
  March CFCs are completely eliminated from Pioneer Group manufacturing processes.
1991 July Company-wide Pioneer Environmental Conservation Committee is established.
1990 December Use of molded pulp (shock absorbing material made from recycled paper) for packing car stereo components begins.
1989 Spring Examination into substitutes for styrene foam packaging begins.
Top of the Page